Afternoon,
I used to think this was possible under the old SPAM update method, but with NW 7.40 SP05, you have to use SUM.
I need to apply SAP Netweaver 7.40 SP05, to an SAP SEM-BCS system.
The SEM-BCS is the one which is included in a stripped down ERP 6 EHP 7 install.
The stack for ERP 6 EHP 7 SPS02 includes Netweaver 7.40 SPS04.
I need SPS05 which requires Kernel 7.41.
How the heck can I generate a stack in MOPz to just update the underlying Netweaver components and not the ERP/SEM-BCS layer?
I thought that support package stacks were introduced to ensure you only upgrade to a complete consistent and compatible stack.
I don't know if I need to go back to SAP and tell them I can't apply their suggested upgrade path. (That's right, SAP suggested this).
Help.